Today, the DfT announced its marvellous, magical changes to HS2 to save costs. These changes are:
ā Reduce the maximum speed from 360 to 320 km/h
š¤ Remove Automatic Train Operation (ATO)
š¦ Reduce the signalling system (ETCS) specification
This will save 2% off HS2's capex. Good idea?