//
sign in
Post
by @danabra.mov
PostEmbed
by @danabra.mov
Record
by @jimpick.com
Record
by @atsui.org
+ new component
Post
Negative long term effects on harbour porpoises from a large scale offshore wind farm in the Baltic—evidence of slow recovery #DNK: Abstract: Offshore wind farms constitute a new and fast growing industry all over the world. This study investigates the long term impact on harbour porpoises,…
23h
Abstract: Offshore wind farms constitute a new and fast growing industry all over the world. This study investigates the long term impact on harbour porpoises, Phocoena phocoena, for more than 10 years (2001–12) from the first large scale offshore wind farm in the world, Nysted Offshore Wind Farm, in the Danish western Baltic Sea (72 × 2.3 MW turbines). The wind farm was brought into full operation in December 2003. At six stations, acoustic porpoise detectors (T-PODs) were placed inside the . . .
www.wind-watch.org
Negative long term effects on harbour porpoises from a large scale offshore wind farm in the Baltic—evidence of slow recovery #DNK
National Wind Watch