Day 2 of demolition progress. This was very fast. The landing took a bit (even though the post fell over with one sledge hit 🫥) and then those joists all came down in 20 minutes before my sawzall battery died
One cut on the left and then pull to the side and they popped out of their hangers
CalebDMTG
Railing had no posts, so popped right off with some taps from a sledge. Ran a circle saw along the deck boards in between the joists, so now they're only attached at the house and the beam.